Case Studies

Weight Savings

The UK Navy which operates vessels all around the world, has a Royal Fleet Auxiliary (RFA) vessel that was experiencing interior flooring issues within their galley. The RFA vessel had water ingress causing delamination of the current flooring system which consisted of cement (screed). Our customer, ERS Marine, contacted SynDeck™ asking us to assist in providing an underlayment system that is durable, lightweight, seamless, waterproof, and offers good corrosion protection.


PDF Icon Case Study - Weight Savings

Hygienic Flooring

A US Navy support ship needed replacement of damaged and poorly draining flooring in fourteen heads. Standing water caused installed resin underlayment and coatings to fail, producing visible cracks and delamination. Puddling water trapped grime and cleaning chemicals, undermining hygienic standards, maintenance and creating serious slip hazards. This continuous service area required a properly draining, waterproof solution to eliminate standing water and support hygienic standards and safety.


PDF Icon Case Study - Hygienic Flooring

Crack Prevention

An offshore oil rig platform in the North Sea needed top to bottom replacement of its galley floor. Previously installed concrete underlayment and resin top coats failed, producing visible cracks. These cracks trapped food debris, creating cleanliness issues. Delaminated edges around drains and scuppers created serious slip hazards and maintenance issues. This continuous service area required a seamless, flexible, waterproof solution to eliminate future cracking and prevent coating delamination and corrosion.


PDF Icon Case Study - Crack Prevention

Wet Spaces

A Navy Daring class destroyer required complete replacement of some of its wet space floors. Decorative rubber tiles installed over cement based underlayment allowed water ingress to penetrate to the steel deck. This resulted in visible delamination of the rubber tiles from the cement based underlayment and steel deck corrosion. Waterproof underlayment and decorative floor covering solutions were needed to prevent future deck corrosion, eliminate floor covering trip hazards and reduce maintenance in the wet spaces. SynDeck Lightweight Underlayment IMO Flex with Flake full resin system was installed to create a waterproof, seamless, wet space decking solution that drains properly and offers decorative appeal.


PDF Icon Case Study - SynDeck Wet Spaces

Corrosion Protection

A Canberra class Royal Australian Navy ship needed urgent replacement of its galley floor. Concrete underlayment and ceramic tiles failed, leaving cracked screed and broken tiles. Improper sloping resulted in standing water that penetrated the concrete underlayment, corroding the steel deck. A solution was needed during the next refit period to waterproof from the deck up and prevent future corrosion, while providing proper sloping to galley scuppers and drains. A SynDeck® Ultra Lightweight Underlayment with Anti-Slip full resin system was installed, providing a waterproof, lightweight interior decking solution that drains properly to improve cleaning and maintenance, while flexing with the ship’s movement.


PDF Icon Case Study - SynDeck Corrosion Protection

Flexibility

A high profile cruise ship needed a decorative and ergonomic flooring system within its medical facilities. SynDeck® products provided a flexible resin system that was easy underfoot. In addition, the system’s fast cure time offered the perfect solution to meet the ship’s tight turnaround times.


PDF Icon Case Study - SynDeck Flexibility

Weight Savings

A UK Royal Fleet Auxiliary (RFA) Navy ship needed urgent replacement of all its main walkways and a variety of service rooms. The failed cement and resin systems had been repaired and recoated many times, but a long term solution was required. SynDeck® products provided an ultra lightweight underlayment and full flooring system that reduced the vessel’s weight by 27,000 lbs (12,000 kg) while providing a much more durable, attractive and waterproof solution.


PDF Icon Case Study - SynDeck Weight Savings

Fast Installation

The flooring system in the heads of the USNS Cape Edmont’s needed complete overhauling. The existing cement underlayments were cracked and leaking and they lacked adequate sloping to facilitate proper drainage. In addition, the replacement flooring system had to be completed while the crew was still living aboard the vessel. SynDeck® products provided a lightweight underlayment system that installed quickly and properly sloped the floors. Lightweight terrazzo was installed on the underlayment and an anti-slip coat was applied for skid resistance. Within only 8 days the new flooring systems were successfully installed in all of the ship’s heads.


PDF Icon Case Study - SynDeck Fast Installation

Water Resistance

SynDeck® products provided a quick-curing, durable, waterproof system that eliminated rust and protected the steel floors of a South American oil rig. The new build needed an underlayment system that could withstand climate constraints during installation and provide long term waterproof protection to the subfloor. The extreme conditions of the tropical climate significantly limited the installation time frame. The new flooring system’s high compressive strength prevents cracking that would expose the steel sheeting and mineral subfloor to moisture.


PDF Icon Case Study - SynDeck Water Resistance

Structural Integrity

Shower pans on board ships often sustain damage, which can produce leaks that cause degradation of the steel underneath the pan. Due to short ship turnover schedules and budgetary constraints, full rip out removal of damaged shower pans is not usually an option. SynDeck® products provide a quick, cost effective repair option that creates a surface with greater structural integrity than that of an undamaged pan.


PDF Icon Case Study - SynDeck Structural Integrity
Go to Top